The obligation of the seller delivered the goods ship's rail at the port of loading is done from that point. Risks of loss or damage related to the goods from that point all the costs borne by the buyer. Board of the vessel does not mean a thing (such as roll-on/roll-off or container transportation), the FCA term is more correct to use.

Copyright © 2016. Sadotrans. All Rights Reserved.